ICSB MALAYSIA SDN BHD

  • Check vessel’s draft and take sounding of BWT, FWT and bunkers at initial and final (before and after loading or discharge) survey to establish load or discharge qty.

 

  • Raised draft marks to be painted and conspicuous and sounding tanks are not choked.

 

  • Avoid using rope, avoid slack tank.

 

  • Use Boat to check draft facing sea bond.

 

  • Use ZEAL hydrometer to test sea water density.

 

  • Counter check ship’s constant.

 

  • Ensure no movement of ship’s crane/derrick or cargo at time of survey.

Draft Survey

COPYRIGHT © 2006-2013  ICSB MALAYSIA SDN BHD. ALL RIGHTS RESERVED.

Netkaki Studio

COMMITTED

 

RELIABLE

 

TRUSTED

Singapore

 

Indonesia

 

China

 

Hong Kong

 

India

 

Rotterdam

 

Germany

 

|         Home         |         About Us         |         Services         |         Support         |         Contact         |

Services

BRIEF INFORMATION ON HOW SURVEY WAS CARRIED OUT

WORLDWIDE QUALITY ASSURANCE. CONTAINER INSPECTION. MARINE SURVEYOR. P & I CLUBS SURVEYOR.

Worldwide Offices